Buildsoft has released an important update of Cubit, on Tuesday 13 June 2017. See release notes below:
Cubit 7.1.3 Release
Enhancements:
Improved Performance*
- Importing a Job has been greatly increased, especially for large Jobs with over 10,000 Items. A job with over 20,000 Items can import up to 45 times faster.
- Opening a Job has been greatly increased, especially for large Jobs with over 10,000 Items. A Job with over 20,000 Items can open up to 10 times faster.
- Collapsing a Trade or Heading was improved to be as fast as expanding a Trade or Heading.
New Task Pane*
- A new button has been added for the Factor fields in the New Task pane, so you can add a Factor from the Constants library directly to a Shape (including when calculating any shape using the Length by Centre Result Type.)
- You can now enter your own Description for the Shape Results of any Shape using the Length by Centre Result Type.
Additional Improvements*
- You can choose to exclude or include Markup when Exporting a Job to Xero as a Purchase Order.
- PL Codes can now be used in the Custom Report Builder.
Fixes:
- Fixed an issue where closing Cubit with the Release licence when exiting option checked was not releasing the Licence.
- Fixed an issue where GFA was being excluded when copying or converting a Job or creating a Job from a Template.
- Fixed an issue where resaving a BUI file after making changes in the BIM Reader and then returning the data to Cubit could display an error message.
- Fixed an issue caused when copying Trades from between Jobs, the Calculation sheet was generating its own Reference Codes.
- Fixed a rare issue where Cubit Manager could not reset a User Password.
- Fixed an issue when Exporting to Excel or Generating Reports from a Job with a Variation on a Trade without Items below it could display an error message.
- Fixed an issue where approved Variations in a Trades would not display in the Approved Variations detail on the Adjustment and sales tax window.
- Fixed an issue where Items using the Result Type of Centre Length on an imperial Job was calculating in metric.
- Fixed an issue where transferring a Job from Global Estimating to Cubit took up to six times longer.
- Fixed an issue where loading a Revision might close the BIM Reader.
*Not available in Cubit Lite
NOT USING CUBIT? ACCESS YOUR 14 DAY FREE TRIAL NOW.
For a full list of enhancements and fixes, the full Cubit 7 Change List is available here.
You can download the Cubit 7.1.3 update now: